READ ALL CAUTIONS CAREFULLY BEFORE INSTALLING PUMP INSTRUCTION MANUAL
10 TROUBLESHOOTING PROBLEM PROBABLE CAUSE REMEDY LOSS OF CHEMICAL RESIDUAL 1. Pump setting too low. 2. Scale at injection point 3. Solution contain
12
J32079 Revision B Addendum Chem-Tech Prime Performance Degassing Pump Head Instructions NOTE: Head is for use on 15, 24 and 30 GPD models only!!
J32079 Revision B 4. Connect the return tubing to the degas valve on the top of the pump head. 5. Secure the other end of the degas return tubing t
J32079 Revision B 234NOTE SPRINGORIENTATIONSMALLSPACERLARGESPACERNOTENOTCHON TOP1NOTEARROWIS UPDISCHARGESUCTIONDEGASRETURNNOTE: PRIME PERFORMANCE DEG
2 TABLE OF CONTENTS Page SAFETY INSTRUCTIONS ...
3 MANUFACTURER’S PRODUCT WARRANTY The manufacturer warrants its equipment of its manufacture to be free of defects in material or workmanship. Liabil
4 10. Standard white polyethylene discharge tubing is not recommended for installations exposed to direct sunlight. Consult supplier for special blac
5 Flooded suction mounting Fig. C (installing feeder at the base of tank on a platform) is the most trouble free type of installation. (Tank stands an
6 DOWN-THE-WELL INSTALLATION: Often it is desirable to provide chemical feed near the intake of the well pump for additional retention time and mi
7 5. Install the bypass tubing from the kit into the bypass port of the bleed valve and hand tighten the coupling nut. Bypass tubing should be conne
8 All air must be purged from the pump head before the pump will pump against pressure. Turn on the power to the pump. Loosen the locking lever by tur
9 7. A setting of "0" will now give zero output. One full revolution of the knob counter clockwise will give maximum output. The knob shoul
Kommentare zu diesen Handbüchern