Nova-tech LMI Roytronic Excel Series AD Metering Pump Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Pumpen Nova-tech LMI Roytronic Excel Series AD Metering Pump herunter. Nova-Tech LMI Roytronic Excel Series AD Metering Pump User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 44
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Lit# 2024.C 10/2011
201 Ivyland Rd.
Ivyland, PA 18974
TEL: (215) 293-0401
FAX: (215) 293-0445
www.lmipumps.com
Carefully read and understand all precautions before
installing or servicing any metering pump.
For le reference, please record the following data:
Model No: _____________________________________
Serial No: _____________________________________
Installation Date: ________________________________
Installation Location: _____________________________
When ordering replacement parts for your LMI Metering Pump
or Accessory, please include complete Model Number and
Serial Number of your unit.
Instruction Manual
ROYTRONIC EXCEL™ Series AD
Electronic Metering Pumps
sales@novatech-usa.com
www.novatech-usa.com
Tel: (866) 433-6682 Fax: (866) 433-6684
Tel: (281) 359-8538 Fax: (281) 359-0084
Seitenansicht 0
1 2 3 4 5 6 ... 43 44

Inhaltsverzeichnis

Seite 1 - Instruction Manual

Lit# 2024.C 10/2011201 Ivyland Rd. Ivyland, PA 18974 TEL: (215) 293-0401 FAX: (215) 293-0445www.lmipumps.comCarefully read and understand all precauti

Seite 2 - ROYTRONIC EXCEL™ Series AD

10INSTALLATION3.3 Tubing Connections   

Seite 3 - Contents

11INSTALLATION3.4 Four-Function Valves (4-FV)Your pump may be equipped with a 4-FV, or standard discharge valve. If your pump is not equipped with a f

Seite 4 - 1.0 PRECAUTIONS

12INSTALLATION3.5 Four-Function Valve InstallationTo install a 4-FV, the 4-FV Fitting and Coupling Nut should be assembled with the appropriate cartri

Seite 5 - PRECAUTIONS

13INSTALLATION3.7 AutoPrime™Pumps installed with the AutoPrime™ Liquid End are equipped with a valve that allows for constant removal of vapors and ga

Seite 6 - 2.0 Introduction

14INSTALLATIONUse CeramicWeight2.0 in. (50 mm)for Sediment AccumulationFoot ValveTilted Sideways WILL NOT PRIMEINCORRECTFoot Valve Must Remain Vertic

Seite 7

15INSTALLATION3.9 Injection Check Valve and Discharge Tubing InstallationThe Injection Check Valve prevents backow from a treated line. Install the

Seite 8 - 3.0 Installation

16OPERATION4.0 Operation4.1 Output Adjustment Controls1. Power Button: This button allows convenient starting and stopping of the pump.2. Mode Sel

Seite 9

17OPERATION 4. Pulse Out (AD9) (Red/Yellow) – On the AD9 this pin gives a100ms pulse output for each pump stroke. 5. 4-20mA Out (AD9) (Red/Bl

Seite 10 - 3.3 Tubing Connections

18OPERATION4.2 Start-up and Adjustmentr5IFQVNQJTOPSNBMMZTFMGQSJNJOHJGTVDUJPOMJGUJTGUNPSMFTTBOEUIFTUFQTCFMPXBSFGPMMPXFEr

Seite 11

19OPERATION4.2.3 Start-Up/Priming for AutoPrime™ Heads (LE-XXXAX or LE-XXXHX)Read this entire section completely before proceeding.When all precautio

Seite 12 - 3.6 FastPrime™

Liquid End*VU[YVS*VKLSee Most Recent Price List for Flow and Pressure Ratings1 – 110-120V US Plug2 – 220-240V US Plug3 – 220-240V DIN Plug5 – 220-240

Seite 13 - AutoPrime™ Liquid End Example

20OPERATION4.3.2 Calibrating the Displayed Flow (AD2, AD8)The Roytronic Excel Pumps are equipped to display a theoretical ow rate based upon the pump

Seite 14

21OPERATION4.4 Methods of Externally Triggering or Pacing AD8 and AD9 PumpsSwitch or transistors must be capable of switching 24V DC at 15 milliamper

Seite 15

22OPERATION4.4.1 Control Modes4.4.1.1 Local/Internal Moder 8IFO JO -PDBM NPEF 3PZUSPOJD &YDFM QVNQT SVO BU UIF TQFFE JOEJDBUFE PO UI

Seite 16 - 4.0 Operation

23MAINTENANCE5.0 Spare Parts Replacement and Routine MaintenanceLMI metering pumps are designed for trouble-free operation, yet routine maintenance

Seite 17 - OPERATION

24MAINTENANCE5.3 Liquifram™ (Diaphragm) ReplacementALWAYS wear protective clothing, face shield, safety glasses and gloves when working near or perfor

Seite 18 - 4.2 Start-up and Adjustment

25MAINTENANCE5.4 Cartridge Valve and O-ring ReplacementALWAYS wear protective clothing, face shield, safety glasses and gloves when working on or per

Seite 19 - 4.3.1 Total Pump Output

26MAINTENANCE5.5 Injection Check Valve Parts ReplacementDepressurize and drain pipeline (or isolate Injection Check Valve point using valves) so that

Seite 20 - where

27MAINTENANCE5.6 FastPrime™ Valve O-Ring ReplacementALWAYS wear protective clothing, face shield, safety glasses and gloves when performing any maint

Seite 21

28MAINTENANCEO-RingsFastPrimeTM ValveRetaining NutFastPrimeTM Valve3/8" Clear Vinyl TubingO-Rings5.6 FastPrime™ Valve O-Ring Replacement (contin

Seite 22

29MAINTENANCE5.7 Drive Parts List

Seite 23 - MAINTENANCE

3Contents1.0 Precautions ... 42.0 Introduction ...

Seite 24 - (Diaphragm) Replacement

30MAINTENANCEBubble NumberDescriptionBubble NumberDescription75 EPU O-Ring 230 Control Panel O-Ring80 EPU Return Spring 240 Wire Harness90 EPU Shim 25

Seite 25

31MAINTENANCE5.8 EPU Wiring Diagram

Seite 26

32MAINTENANCE5.9 Liquid End PartsFor the latest and most accurate information on your liquid end, please refer to the Liquid End Sheets available in t

Seite 27

33MAINTENANCE'(3(1&a

Seite 28

34MAINTENANCE3,3($1'3,3(),77,1*6$5(&86720(56833/,('3,3($1'3,3(),77,1*6$5(&86720(56833/,(&

Seite 29 - 5.7 Drive Parts List

35WIRING DIAGRAMS6.0 Wiring Diagrams5 PIN CONNECTORUSE 5 PIN CABLE (LMI P/N 48414)PIN WIRE SIGNAL12345WhiteGreen-YellowRemote On-Of

Seite 30

36WIRING DIAGRAMSINPUT WIRING DIAGRAMS

Seite 31 - 5.8 EPU Wiring Diagram

37WIRING DIAGRAMSINPUT WIRING DIAGRAMS

Seite 32 - 5.9 Liquid End Parts

38WIRING DIAGRAMS4INPUT WIRING DIAGRAM

Seite 33

39WIRING DIAGRAMSOUTPUT WIRING DIAGRAMS

Seite 34

4PRECAUTIONS1.0 PRECAUTIONSThe following precautions should be taken when working with LMI metering pumps. Please read this section carefully prior to

Seite 35 - 6.0 Wiring Diagrams

40PROBLEM POSSIBLE CAUSE SOLUTIONPump Will Not Prime 1. Pump not turned on or plugged in. 1. Turn on pump/plug in pump.2. Output dials not set pr

Seite 36 - INPUT WIRING DIAGRAMS

41TROUBLESHOOTINGPROBLEM POSSIBLE CAUSE SOLUTIONLeakage at tubing 1. Worn tubing ends.1. Cut about 1 in (25 mm) off tubing and then replace as befo

Seite 37

— NOTES —

Seite 39 - OUTPUT WIRING DIAGRAMS

Liquifram, Liquitron, Micropace, FastPrime, AutoPrime, and Pro Pac are trademarks of Milton Roy Company, Teon is a registered trademark of E. I. du

Seite 40 - 7.0 Troubleshooting

5PRECAUTIONSBack Pressure/Anti-Syphon ValveIf you are pumping downhill or into low or no system pressure, a back pressure/anti- syphon device such as

Seite 41 - TROUBLESHOOTING

6INTRODUCTION2.0 IntroductionLMI is the world’s most versatile manufacturer of economical and efcient metering pumps. This manual addresses the insta

Seite 42 - — NOTES —

7UNPACKING CHECK LIST2.2 Unpacking Check List Your carton will contain many or all of the following items. Please notify the carrier immediately if

Seite 43

8INSTALLATIONCORRECT3.0 Installation3.1 Pump Location and InstallationLocate pump in an area convenient to solution tank and electrical supply.The pu

Seite 44 - FAX: (215) 293-0445

9INSTALLATION3.2.2 Suction Lift - Wall Bracket MountThe pump may be mounted using an LMI Wall Mount Bracket Assembly (part no. 34643) directly above

Kommentare zu diesen Handbüchern

Keine Kommentare